Be part of a new era of aquatics at UBC

The new UBC Aquatic Centre has been purpose-built for the current and future needs of students, staff, faculty and residents of UBC’s Point Grey campus. The bright, open facility design brings in an abundance of natural light which underlines the open and inclusive community space. This one-level facility includes a ramp entrance into both the leisure and the 25m recreation tanks, as well as a lift into the hot tub.

The New UBC Aquatic Centre - Opening January 2017

The New UBC Aquatic Centre - Opening January 2017

The New UBC Aquatic Centre - Opening January 2017


The facility includes a women’s and a men’s change room, as well as a universal change room that will be open to all individuals. The three separate tanks can operate at different temperatures. This allows for new programming options to service a wide range of interests and abilities.

Highlights

  • Competition 50m length pool
  • Recreational 25m lap pool
  • Leisure pool with lazy river
  • Hot tub
  • Steam and sauna
  • Universal change room
  • New programming
  • Membership packages
  • Accessible access to recreational pool, leisure pool, and hot tub